<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:content="http://purl.org/rss/1.0/modules/content/">
	<channel>
		
		<title>Pihl RSS</title>
		<link>http://www.pihl-as.com/</link>
		<description>Pihl RSS</description>
		<language>en</language>
		<image>
			<title>Pihl RSS</title>
			<url>http://www.pihl-as.com/EXT:tt_news/ext_icon.gif</url>
			<link>http://www.pihl-as.com/</link>
			<width></width>
			<height></height>
			<description>Pihl RSS</description>
		</image>
		<generator>TYPO3 - get.content.right</generator>
		<docs>http://blogs.law.harvard.edu/tech/rss</docs>
		
		
		
		<lastBuildDate>Fri, 27 Aug 2010 15:29:00 +0200</lastBuildDate>
		
		
		<item>
			<title>Nahant Causeway project in progress</title>
			<link>http://www.pihl-as.com/press/news/single-view/select_category/1%2C2%2C4/article/vejarbejde-i-usa-uden-trafikprop/</link>
			<description>Even though the Nahant Beach Reservation Rehabilitation Project in Nahant, Massachusetts includes...</description>
			<content:encoded><![CDATA[<p>&nbsp;</p>
<p>&nbsp;</p>
<p>The $20 million Nahant Beach Reservation Rehab Project in Nahant, Massachusetts&nbsp;officially got underway June 10, 2010 and is, <a href="http://www.itemlive.com/articles/2010/08/02/news/news07.txt" title="Opens external link in new window" target="_blank" class="external-link-new-window" >according to the local police force, &quot;..going better than we expected and we've had very few complaints about traffic and delays due to&nbsp;work.</a>&quot;</p>
<p>The rebabilitation will greatly improve vehicular and pedestrian safety on the roadway and includes full depth pavement reconstruction, replacement of the existing drainage system, reconfiguration of the Reservation entrance and exit; reconfiguration of the Public Access Board boat launch ramp; repair and replacement of the existing stone revetment (riprap), seawall repairs, landscape improvements, and environmental mitigation in the Rumney Marsh Reservation located in Saugus, Massachusetts. </p>
<p>The work is carried out by Pihls American subsidiary, <a href="http://www.pihl-inc.us/" title="Opens external link in new window" target="_blank" class="external-link-new-window" >Pihl Inc.</a> and is to be accomplished within 1,092 calendar days.</p>
<p>&nbsp;</p>]]></content:encoded>
			<category>News</category>
			<category>Press Releases</category>
			
			
			<pubDate>Mon, 23 Aug 2010 15:07:00 +0200</pubDate>
			<enclosure url="http://www.pihl-as.com/uploads/media/DSCF1508.jpg" length ="2553034" type="image/jpeg" />
		</item>
		
		<item>
			<title>Bridge completed in 42 days</title>
			<link>http://www.pihl-as.com/press/news/single-view/select_category/1%2C2%2C4/article/broen-klar-til-myldretidstrafikken/</link>
			<description>The large steel elements for the new bridge in Bagsværd north of Copenhagen, Denmark were...</description>
			<content:encoded><![CDATA[<p>The large steel elements for the new bridge in Bagsværd north of Copenhagen, Denmark&nbsp;were assembled on a special site and then transported to the construction site on flat-bed trucks from where they were lifted directly in place. </p>
<p>The mounting work on the new bridge was completed in 42 days.</p>
<p><a href="projects/project-singleview/hilleroedmotorvejen-m12-skovdiget/" >Read more</a></p>]]></content:encoded>
			<category>News</category>
			<category>Press Releases</category>
			
			
			<pubDate>Tue, 10 Aug 2010 10:36:00 +0200</pubDate>
			
		</item>
		
		<item>
			<title>Congratulations Ramboll!</title>
			<link>http://www.pihl-as.com/press/news/single-view/select_category/1%2C2%2C4/article/tillykke-til-ramboell/</link>
			<description>Today 1,600 employees from Ramboll move to the engineering, design and consultancy company’s new...</description>
			<content:encoded><![CDATA[<p>The construction of the new 40,000 square metre head office is carried out by Pihl as main contractor in partnering.</p>
<p><a href="projects/project-singleview/ramboell-nyt-hovedkontor/" >Read more about the project <br /></a></p>]]></content:encoded>
			<category>News</category>
			<category>Press Releases</category>
			
			
			<pubDate>Mon, 09 Aug 2010 10:35:00 +0200</pubDate>
			<enclosure url="http://www.pihl-as.com/uploads/media/Ramboll_HQ_exterior.jpg" length ="1248342" type="image/jpeg" />
		</item>
		
		<item>
			<title>Turnkey contract for the UN City in Copenhagen</title>
			<link>http://www.pihl-as.com/press/press-releases/single-view/select_category/1%2C2%2C4/article/totalentreprisekontrakt-paa-fn-byen/</link>
			<description>Today CPH City and Port Development signed a turnkey contract for the UN City in Copenhagen. The...</description>
			<content:encoded><![CDATA[<p>Press Release 29 June </p>
<p>The construction of the UN City will at the same time be the kick off for the development of the area currently being part of Copenhagen’s Free Port.<br />In less than three years the UN will be moving to its new headquarters at The Marble Pier; a building specially designed to accommodate the UN’s six organisations based in Denmark. The buildings will cover a floor area of 28,000 m2 and will be given a high environmental profile. </p>
<p><i>‘The UN City is part of the urban development taking place in the area of The Marble Pier, which will give the residents of Copenhagen access also to this part of the harbour area . It is a large-scale project and a big contract that has been signed today. I look forward to the further co-operation on the project,’</i> says Managing Director of CPH City and Port Development, Jens Kramer Mikkelsen.</p>
<p>The tender process for the six pre-qualified contractors was finalised on Friday 28 May 2010 and the winning company was E. Pihl &amp; Søn A.S., which is to be in charge of the first stage of the construction of the UN City with a floor area of about 28,000 m2. The initial task will be to complete the work for submission of requests for building licences to the City of Copenhagen latest on 1 September 2010. The first building licence is expected to be granted on 1 December 2010, and the construction work can then be commenced.</p>
<p><i>‘The UN City will add yet another spectacular building complex to Copenhagen, and Pihl looks forward to carrying out this project in co-operation with the employer, CPH City and Port Development , and the other parties in the project. Pihl has many years’ experience of large, complex construction tasks, and our employees are therefore well equipped to solve the task at The Marble Pier,’</i> says Project Director Hans Anker Nielsen of E. Pihl &amp; Søn A.S.</p>
<p>The UN City will be located at The Marble Pier and be part of the urban development of that area.&nbsp;The Marble Pier&nbsp;is much more than the UN City; a new housing area will be established as will a new hotel and commercial buildings – e.g. Steven Holls Architects’ spectacular 2-tower project – called the LM Project – which will be connecting Langelinie and The Marble Pier.</p>
<p>The Marble Pier is today part of the fenced in Free Port, but this will change when the development of the area begins - a new recreational area will be established at the head of the pier. And the UN City will contribute to creating an international environment with interesting architectural elements close to the city of Copenhagen.&nbsp;</p>
<p>The Marble Pier is being developed in a co-operation with Nordkranen and SNS Property Finance. The LM Project is, apart from the above-mentioned, also being developed in a co-operation with ATP. </p>
<p><b>Facts on the UN City:<br /></b>The employer behind the UN City is CPH City and Port Development, and the house will be built as an low-carbon building. The Danish Energy Class 1 designation means that it will be an environmentally-friendly&nbsp; building using&nbsp; less than 50 Kwh per square metre per year for heating. A large solar cell plant will be located on the roof of the building, and the building will be constructed on an independent island specially constructed for the UN City. The UN City project has been designed by the architects 3XN, and the building is expected to be ready for moving in at the turn of the year 2012/13.</p>
<p><br /><b>The six UN organisations currently based in Denmark are: <br /></b>UNOPS – United Nations Office for Project Services <br />UNDP – United Nations Development Programme <br />WHO – United Nations World Health Organization <br />UNICEF - United Nations Children's Fund<br />WFP – United Nations World Food Programme <br />UNFPA – United Nations Population Fund</p>
<p><b>Press and Media Services: <br /></b>Please contact CPH City and Port Development’s Head of Press, Pernille Garde Abildgaard, on telephone: +45 2916 0586.</p>
<p><b>E. Pihl &amp; Søn A.S.<br /></b>Project Director Hans Anker Nielsen, telephone +45 4527 7200<br /><a href="presse/presserum/pressekontakt/" title="Opens internal link in current window" class="internal-link" >Press Contact</a></p>
<p>&nbsp;</p>]]></content:encoded>
			<category>Press Releases</category>
			
			
			<pubDate>Wed, 30 Jun 2010 14:54:00 +0200</pubDate>
			<enclosure url="http://www.pihl-as.com/uploads/media/FN_byen-fugl-3XN_480.jpg" length ="55925" type="image/jpeg" />
		</item>
		
		<item>
			<title>Pihl is constantly on the outlook for talented and resourceful people for our projects in Denmark and abroad </title>
			<link>http://www.pihl-as.com/job-and-career/vacant-jobs/single-view/select_category/1%2C2%2C4/article/vi-har-ingen-ledige-jobs-pt/</link>
			<description>For the time being no jobs are available, but you are welcome to send us an an unsolicited...</description>
			<content:encoded><![CDATA[<p><a href="http://ig4.i-grasp.com/fe/tpl_pihl01.asp?newms=ap&amp;id=51655&amp;newlang=1" title="Opens external link in new window" target="_blank" class="external-link-new-window" >Application form</a></p>
<p><a href="job-og-karriere/job-i-pihl/soeg-job-online/" title="Opens internal link in current window" class="internal-link" >Read more about a career at Pihl</a></p>]]></content:encoded>
			<category>Jobs</category>
			
			
			<pubDate>Wed, 23 Jun 2010 13:24:00 +0200</pubDate>
			
		</item>
		
		<item>
			<title>Pihl extends and renovates the headquarters of the Confederation of Danish Industry</title>
			<link>http://www.pihl-as.com/press/press-releases/single-view/select_category/1%2C2%2C4/article/pihl-ombygger-industriens-hus/</link>
			<description>E. Pihl &amp; Søn A.S. and DI have today entered into a turnkey contract for the extension and...</description>
			<content:encoded><![CDATA[<p>Press release from <br />E. Pihl &amp; Søn A.S. and DI (the Danish Confederation of Danish Industry)</p>
<p>June 16 2010</p>
<p><br />E. Pihl &amp; Søn A.S. is to extend and renovate “Industriens Hus”, the headquarters of the Confederation of Danish Industry (DI)</p>
<p>The construction work is to commence on 1 September 2010 and is to be handed over on 31 May 2013.</p>
<p>DI’s headquarters has for many years been located at Rådhuspladsen in Copenhagen. It was on this spot in Copenhagen, where DI’s headquarters has now been located since 1980, that DI’s predecessor, ”Industriforeningen” had its headquarters built in 1878.</p>
<p>DI wishes their headquarters to have a clear and visible environmental profile. The building has been designed to meet the energy consumption requirements for Low Energy Class 2 which means that very strict requirements for the renovation of existing buildings are met.</p>
<p>- <i>Today’s signing of the contract with turnkey contractor Pihl has brought us a big step further in this large construction project. The aspiration is, in three years from now, to end up with a modern, contemporary Industriens Hus that contributes to the plan of the City of Copenhagen to form a metropolis zone. We want to create a building which makes the area around Rådhuspladsen a more coherent area,</i> says DI’S Managing Director, Hans Skov Christensen.</p>
<p>- <i>Pihl has over the past years constructed a number of outstanding buildings in Copenhagen, and we are pleased to have the opportunity to extend and renovate DI’s headquarters. This is a very challenging project which is in keeping with Pihl’s wish to constantly develop the qualifications of our employees and challenge our own ability to see new opportunities,</i> says Project Director Hans Anker Nielsen, E. Pihl &amp; Søn A.S.</p>
<p>Today, Industriens Hus has a floorage of about 25,000 m². On completion of the renovation, the total floorage will have been increased to about 40,000 m². The reason for the extension is an increasing need for more conference facilities and of-fices. A larger headquarters will make it possible for DI to gather all employees under one roof just as DI can let offices to its various member associations and others.</p>
<p>The project comprises replacement of the present facade by a transparent glass facade, which will be used for display signs as is the case today. The part of the build-ing turning towards Rådhuspladsen will be increased by two storeys and in the part of the building turning towards H.C. Andersens Boulevard, a new 6-storey atrium will form the connection between Rådhuspladsen and the building. </p>
<p>Towards the street of Vesterbrogade, three more storeys will be added. Shops will be occupying two storeys. The facade will in this way be opened towards the street, urban life strengthened and the wide boulevard will become more attractive. </p>
<p>The public parking lot under Industriens Hus will be preserved.<br />&nbsp;<br />The design of the building has been made in respect of its settings and neighbour, the Tivoli Gardens. Towards the Tivoli Gardens, the 8-storey terraced building steps down to two stories behind the Pantomime theatre in the Tivoli Gardens. This part of the building will have roof terraces with plants. The lighting in the offices will be adjusted by Venetian blinds just as trees will be planted in the property line to the Tivoli Gardens. </p>
<p>The project has been designed by architect Lars Bendrup from the architects TRANSFORM in Aarhus, Jutland. Consulting engineer is Rambøll Danmark A/S. Employer’s representative is Grontmij|Carl Bro A/S.</p>
<p>DI will during the construction period move to temporary quarters at <a href="projects/project-singleview/copenhagen-towers/" >Copenhagen Towers</a> in the Ørestad south of the Copenhagen city centre. The move will take pla-ce in the middle of August 2010.</p>
<p>For further information, please contact <a href="http://www.di.dk/" title="Opens external link in new window" target="_blank" class="external-link-new-window" >DI’</a>s Public Relations Manager, Rolf Ejlertsen, on phone +45&nbsp; 3377 3736 or +45 2220 4923.</p>
<p>&nbsp;</p>]]></content:encoded>
			<category>Press Releases</category>
			
			
			<pubDate>Thu, 17 Jun 2010 15:37:00 +0200</pubDate>
			<enclosure url="http://www.pihl-as.com/uploads/media/DI_intranet.jpg" length ="52208" type="image/jpeg" />
		</item>
		
		<item>
			<title>DK's largest low-energy building</title>
			<link>http://www.pihl-as.com/press/press-releases/single-view/select_category/1%2C2%2C4/article/navitas-park-i-aarhus/</link>
			<description>The winning team behind Navitas Park announced
Navitas Park in Århus - Denmark's largest...</description>
			<content:encoded><![CDATA[<p>Press release 21 May 2010</p>
<p>The winning team in the prestigious competition to build Navitas Park at the new waterfront in Aarhus has been announced; Contractor E. Pihl &amp; Son A .S., Kjaer &amp; Richter Architects Ltd, Christensen &amp; Co Architects Ltd,&nbsp; Marianne Levinsen Landscape Ltd and advisory firm ALECTIA A / S are chosen to build the 35,000 m2 to accommodate the Aarhus School of Engineering, Aarhus School of Marine and Technical Engineering and INCUBA Science Park.</p>
<p>From 2014 more than 2,000 students, lecturers and professionals will occupy Navitas Park on the new waterfront in Aarhus. The building will house the Aarhus School of Engineering, Aarhus School of Marine and Technical Engineering and INCUBA Science Park and provide education, development and training with focus on energy. It will be Denmark's largest low-energy building and have a budget of approx. Dkr 700 million. As part of the project Aarhus Municipality will construct a public parking lot with approx. 450 parking spaces.</p>
<p><i>&quot;The winning team has achieved the vision of Navitas Park with a competent and comprehensive understanding of the project. On a pragmatic basis a convincing project is established which meets the users' requirements for functionality, utilization and architecture as well as the city's aspirations towards future energy requirements. This beautiful, crystalline edifice is a very compelling and sensible project, everything seems to be at the right place and the project is in fine balance with the building program requirements,</i> &quot; the President of the jury, CEO of INCUBA Science Park Niels Christian Sidenius states and continues:&nbsp; <i>&quot;Functionally the project stands out as the best in the competition. Aarhus will have a really beautiful and prominent building on the waterfront. The project adds a special profile to the site through the placement of the main entrance and in the architectural expression. The unique form of the crystal sits extremely well on the distinguished location on the island, the sculptural qualities enhances the impressive project, it was with no hesitation that we recommended it as the best in the competition. &quot;</i></p>
<p>The winning team at Navitas Park is; Contractor E. Pihl &amp; Son A/S, Kjaer &amp; Richter Architects A/S, Christensen &amp; Co Architects A/S. Marianne Levinsen Landscape Ltd and advisory firm ALECTIA A/S.</p>
<p><b>Outstanding&nbsp; knowledge centre and innovative environment</b> <br />The three institutions,&nbsp; the Aarhus School of Engineering, Aarhus School of Marine and Technical Engineering and INCUBA Science Park, each have their own premises and facilities with shared facilities in the form of canteen, health club, meeting rooms etc. The goal of Navitas Park is to create an outstanding center, to be the leaders for knowledge in an innovative environment for energy, environment and construction education, the location, at the heart of Aarhus, establishes it as a first class environment for learning, innovation and entrepreneurship.</p>
<p>Navitas Park will be an open and energetic complex, where students, researchers, educators and the industry inspire each other to the benefit of all parties. The idea is to create an internationally competitive and attractive environment for students, researchers and businesses.</p>
<p><b>Focus on low-energy <br /></b>Navitas Park has a very ambitious green profile, meaning that the building will use only a fraction of the energy normally consumed by a building of this type. It is an independent goal for the building to appear as an international beacon of energy conservation and use of energy technologies.<br /><i>&quot;A range of specific energy measures are included in the proposal as a full scale laboratory where students and visitors can explore modern, innovative energy solutions,&quot; </i>Niels Christian Sidenius explains.</p>
<p>With its impressive location, the building also represents a unique opportunity to demonstrate and highlight the development potential of sustainable state of the art energy technologies, supported by the architecture.</p>
<p>The project coincides with the building of another key project Aarhus harbor, Aarhus Municipality’s upcoming multimedia house and new waterfront which also opens in 2014. </p>
<p><b>For further information: <br /></b><a href="http://www.navitaspark.dk/" target="_blank" >www.navitaspark.dk</a></p>
<p>President of Navitas Park jury, Niels Christian Sidenius, CEO, INCUBA Science Park. <br />Telephone: +45 8734 5552<br />Mobile: +45 2467 5362</p>
<p><br /><b>Contact E. Pihl &amp; Son A.S.:<br /></b>Knud Vium Andersen<br />Telephone +45 7641 2283</p>
<p>&nbsp;</p>]]></content:encoded>
			<category>Press Releases</category>
			
			
			<pubDate>Fri, 21 May 2010 14:02:00 +0200</pubDate>
			
		</item>
		
		<item>
			<title>Annual Report 2009</title>
			<link>http://www.pihl-as.com/press/news/single-view/select_category/1%2C2%2C4/article/aarsrapport-2009/</link>
			<description>Despite a modest increase of new orders, not at least in the Icelandic market, the Pihl Group's...</description>
			<content:encoded><![CDATA[<p>Pihl’s turnover for 2009 totalled EUR 733 million, corresponding to a decrease of 15.8% compared to 2008. However, the result for the year is satisfactory at a profit of EUR 10 million compared to EUR 7.5 million in 2008. Profit for the year after tax was EUR 7 million against EUR 3 million in 2008. </p>
<p><b>Unchanged exports <br /></b>In 2009 we were active in sixteen countries outside Denmark, and the total share of exports amounts to 55%, which is similar to previous years.<br />In Denmark we handed over a number of completed projects; and in spite of the modest increase of new orders in our trade, we were awarded with various new contracts for building and construction works at year end. </p>
<p><b>Expectations </b><br />In the first quarter of 2010 the launch of tenders in Denmark and abroad increased, and therefore the order book for 2010 looks quite promising. </p>
<p><br /><a href="om-pihl/aarsrapport/" title="Opens internal link in current window" class="internal-link" >Read/Download a summary of the Annual Report 2009 </a></p>
<p>The full annual report and its notes can be obtained upon request to our Financial Manager, Anne Brown Frandsen, phone: +45 4527 7200.</p>
<p>10 May 2010</p>]]></content:encoded>
			<category>News</category>
			<category>Press Releases</category>
			
			
			<pubDate>Mon, 10 May 2010 09:06:00 +0200</pubDate>
			<enclosure url="http://www.pihl-as.com/uploads/media/Forside_01.jpg" length ="78467" type="image/jpeg" />
		</item>
		
		<item>
			<title>Petzi and Pihl in Tivoli</title>
			<link>http://www.pihl-as.com/press/news/single-view/select_category/1%2C2%2C4/article/rasmus-klump-og-pihl-i-tivoli/</link>
			<description>Pihl builds pancake restaurant to the cartoon character &quot;Petzi&quot; (also known as &quot;Bruin&quot;) and his...</description>
			<content:encoded><![CDATA[<p>In the spring of 2010 Tivoli inaugurates a new attraction in the Tivoli gardens called “Petzi’s World”&nbsp;with pancake restaurant, the whale “Valde” and the good ship “Mary”.</p>
<p>Petzis World replaces the playground next to the Tivoli Lake and Pihl’s work comprises restaurant, technician's building and support wals of concrete, earthworks, sewerage and ground works as well as paving and various attractions.</p>
<p>Read more about Petzi’s World on <a href="http://www.tivoli.dk/composite-8418.htm" title="Opens external link in new window" target="_blank" class="external-link-new-window" >Tivoli’s homepage<br /></a></p>
<p>7 April 2010</p>]]></content:encoded>
			<category>News</category>
			<category>Press Releases</category>
			
			
			<pubDate>Wed, 07 Apr 2010 11:53:00 +0200</pubDate>
			
		</item>
		
		<item>
			<title>Pihl to build large hydro power station in Greenland </title>
			<link>http://www.pihl-as.com/press/press-releases/single-view/select_category/1%2C2%2C4/article/pihl-bygger-stort-vandkraftvaerk-i-groenland/</link>
			<description>The town of Ilulissat in Greenland can during 2012 and 2013 “put its present oil-heated combined...</description>
			<content:encoded><![CDATA[<p><span lang="EN-GB">Press Release 10 March 2010</span></p>
<p><span lang="EN-GB">The Greenlandic energy utility of Nukissiorfiit and Pihl have signed a contract for a new hydro power station to supply Ilulissat with electricity and electrical heating. The station will be producing about 65 GWh and will thereby be the country’s second largest station. </span></p>
<p><b><span lang="EN-GB">Experienced contractor in the construction of hydro power stations<br /></span></b><span lang="EN-GB">Pihl has since the 1950’s built a number of hydro power stations in Iceland and Greenland and is presently building one in Panama also. For Nukissiorfiit, Pihl has built hydro power stations in Tasiilaq and <a href="projects/project-singleview/qorlortorsuaq-vandkraftvaerk-groenland/" >Qorlortorsuaq</a> in Greenland, and in November 2009 Nukissiorfiit began supplying electricity from a completely new hydro power station in <a href="projects/project-singleview/sisimiut-vandkraftvaerk/" >Sisimiut</a>.&nbsp;</span>&nbsp;</p>
<p><span lang="EN-GB">‘<i>Construction of hydro power stations is one of our earliest specialties, and Pihl employs a number of well qualified engineers and craftsmen with much experience in the field of construction of hydro power stations and tunnels. Many of them have worked in Greenland or in Iceland for many years and are accustomed to the extraordinary challenges that the Greenlandic climate and landscape pose for a contractor,’ </i>says Kurt Carlsen, E. Pihl &amp; Søn A.S.</span></p>
<p><i><span lang="EN-GB">‘ If you are in need of a particular spare part, you can’t just get it around the corner. Planning and logistics are therefore of vital importance. When unexpected situations occur on the site, the people working there must be able to improvise and be able to handle many different kinds of situations,</span></i><span lang="EN-GB">’ adds Kurt Carlsen, who is looking forward to continuing the good cooperation with the energy utility on this new project in Ilulissat.</span></p>
<p><span lang="EN-GB">Apart from constructing hydro power stations in Greenland, Pihl has also carried out a number of building and civil engineering tasks, e.g. airports in Sisimiut, Qaanaaq and Paamiut, the University Park in Nuuk, offices and housing units in Nuuk and numerous ports in e.g. Ilulissat, Upernavik and Aasiaat. </span></p>
<p><b><span lang="EN-GB">Good for the environment and the energy budget<br /></span></b><span lang="EN-GB">The new hydro power station is to supply electricity from a turbine as early as from 1 November 2012; and when the entire station is running in 2013, Ilulissat can “put its present oil-heated combined heating and power station on the substitutes' bench” and introduce green energy.</span></p>
<p><span lang="EN-GB">The station will be situated about 50 km north-east of Ilulissat. On this site it will be possible to take advantage of the drop height from a water reservoir which is 187 m above sea level. The water is led through an approx. 6 km long tunnel to a subterranean power station where three 7.5 MW turbines with generators are to convert the hydro power into electricity. Apart from the power station and blasting of the necessary tunnels, Pihl is also to construct a transmission line to Ilulissat, incl. sub-station.</span></p>
<p><span lang="EN-GB">Commencement of the works&nbsp;is planned to take place in June 2010.</span></p>
<p><b><span lang="EN-GB">For further information, please contact one of the below persons:<br /></span></b><span lang="EN-GB">Project Director Bjørn Stefansson&nbsp;&nbsp;<br /></span><span lang="EN-GB">Pihl &amp; Søn Grønland ApS&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<br /><span lang="EN-GB"><a href="mailto:bjs@pihl-as.dk" >bjs@pihl-as.dk</a>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;<br /></span><span lang="EN-GB">Tel.&nbsp;&nbsp;&nbsp; </span>+45 4527 7200&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <br /><span lang="EN-GB">Mobile&nbsp;</span><span lang="EN-GB">+45 5137 6056&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></p>
<p><span lang="EN-GB"></span></p>
<p><span lang="EN-GB">Director Kurt Carlsen&nbsp;<br /></span><span lang="EN-GB">E. Pihl &amp; Søn A.S.&nbsp; <br /></span><span lang="EN-GB">Nybrovej 116<br /></span><span lang="EN-GB">2800 Kgs Lyngby<br /></span><span lang="EN-GB">Denmark<br />Tel. + 45 </span><span lang="EN-GB">4527 7100</span></p>
<p><span lang="EN-GB"><a href="http://www.pihl-as.dk/" target="_blank" >www.pihl-as.dk</a></span></p>
<p>&nbsp;</p>]]></content:encoded>
			<category>Press Releases</category>
			
			
			<pubDate>Wed, 10 Mar 2010 13:19:00 +0100</pubDate>
			
		</item>
		
	</channel>
</rss>